Method statement

A document describing how a specific task will be carried out safely, setting out the sequence of work, the hazards involved, the controls to be applied and the resources required.

Also known as

RAMS

By jurisdiction

🇬🇧

UK HSE

“method statement”Close equivalent

Not defined in a single HSE statute. Required by HSE guidance and industry practice, particularly in construction under CDM 2015 and for high-risk tasks. Together with a risk assessment it forms a RAMS document.

GuidanceSource
🇮🇪

Irish HSA

“method statement”Close equivalent

Used in Irish construction under the Safety, Health and Welfare at Work (Construction) Regulations 2013. Required as part of safety documentation for higher-risk construction tasks.

RegulatorySafety, Health and Welfare at Work (Construction) Regulations 2013Source
🇺🇸

US OSHA

“method statement”No equivalent

No equivalent in this jurisdiction.

Jurisdiction note: OSHA does not use method statement as a regulatory term. The equivalent US practice is the Job Hazard Analysis (JHA).
GuidanceSource

Practitioner note: A RAMS (Risk Assessment and Method Statement) is the industry-standard combined document on construction sites. The method statement describes how work will be done; the risk assessment identifies and controls the hazards.