Temporary works
Structures, plant or equipment built or assembled on site to enable permanent works to be constructed or to support the structure during construction, then removed. Includes falsework, formwork, shoring and cofferdams.
Also known as
By jurisdiction
UK HSE
“temporary works”Close equivalentCDM 2015 (SI 2015/51) requires that temporary works are planned, managed and monitored. HSE and CIRIA recommend appointment of a temporary works coordinator for complex temporary works.
Irish HSA
“temporary works”Close equivalentThe Construction Regulations 2013 (SI 2013/291) require that all temporary structures used during construction are designed, erected, maintained and dismantled safely.
US OSHA
“temporary structures”Close equivalentOSHA 29 CFR 1926.703 addresses formwork and shoring in concrete construction. General requirements for temporary structures are covered by applicable OSHA construction standards.
Practitioner note: Needs its own design and independent check regime, with a temporary works coordinator on larger projects. Falsework and shoring collapses cause a disproportionate share of serious incidents.