Home›Glossary›Safe electrical isolation
All terms
Near equivalentWork equipment › Electrical safety

Safe electrical isolation

The process of disconnecting electrical equipment from all sources of electrical supply and proving that it is dead before work begins. A fundamental electrical safety procedure required by the Electricity at Work Regulations.

Also known as

lock offprove dead

By jurisdiction

🇬🇧

UK HSE

“safe electrical isolation”Exact equivalent

Regulation 12 of EAWR 1989 requires that no person shall work on electrical equipment while it is live unless it is unreasonable in all circumstances for it to be dead. The safe isolation procedure involves: switch off; isolate; lock off; prove dead. HSE guidance describes the four-step process.

RegulatoryElectricity at Work Regulations 1989 (SI 1989/635), regulation 12Source
🇮🇪

Irish HSA

“safe electrical isolation”Close equivalent

The General Application Regulations 2007 (Part 3, Chapter 3) require that electrical systems are made safe before work is carried out on them. The safe isolation procedure (isolate, lock off, prove dead) is the standard approach required by good practice and the regulations.

RegulatorySafety, Health and Welfare at Work (General Application) Regulations 2007, Part 3, Chapter 3Source
🇺🇸

US OSHA

“safe electrical isolation”Close equivalent

OSHA 29 CFR 1910.333(b)(2) requires that before work is done on electrical equipment, it be deenergised and locked out or tagged out under an energy control program meeting 1910.147. The OSHA electrical safety isolation process is part of the broader lockout/tagout standard rather than a standalone electrical-specific isolation procedure.

Jurisdiction note: OSHA integrates electrical isolation into the general lockout/tagout standard (1910.147). The GB and Irish approach distinguishes electrical isolation (EAWR/GAR) from mechanical isolation (PUWER/GAR).
Regulatory29 CFR 1910.333(b)(2); 29 CFR 1910.147Source

Practitioner note: Prove dead with an approved voltage indicator, proved on a known source before and after the test. Lock off and keep the key personally.

Nearest equivalent in other frameworks

  • →isolation-lockout-tagout (OSHA — same concept, different terminology)

Ready to Join Us?

Start your journey towards simpler, more effective health and safety management today.

30-day free trial · Cancel anytime